|
|
Login to enhance your shopping experience. Login or Create an Account |
|
Categories
Main Menu
Online Store Menu
Quick Store Search
Shopping Cart
There are no items in your shopping cart. |
Shade Sails - Installation Shade Sails - Installation This is a guide only, schedules listed are based on typical shade sail installations under normal conditions. Please Note: The fixings shown here are typical and are based on shade sail installations under normal conditions. Where the structural suitability of a pre existing structure is in question, or you are unsure or have any doubts at all, a local building inspector/contractor or structural engineer should be consulted before proceeding. Eyebolts
Steel Columns for shade sails
Footings for Shade sails Posts should be directly embedded in Concrete (min 20mpa) footings. The table below describes the minimum hole size you should use, based on the height of the post above ground level .
Post InstallationPosts should be set with an approx 5 degree angle leaning away from the sail tension. Allow min 5 days to set before fitting shade sails.
Please Note: The fixings shown here are typical and are based on shade sail installations under normal conditions. Where the structural suitability of a pre existing structure is in question, or you are unsure or have any doubts at all, a local building inspector/contractor or structural engineer should be consulted before proceeding. Wall Fixingscontent
The use of sail track is a very popular alternative that produces a flush edge along a wall or facia. The sail track should be fixed at 300mm (min) intervals. content Rafter Brackets are an ideal method to locate fixing points at facia height. Take a roof tile out near the desired position, and locate a roof truss. The Rafter Bracket is fixed to the roof truss with M10 nuts & bolts. content
Installing Your Shade Sail content
|
Account Menu
Recently Visited Pages
Popular Pages
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||